Eli Lilly's Lafayette facility was having significant problems with their centrifuge equipment, which processes liquid streams in purification. There were an average of two belt failures and one seal failure every week, along with vibration levels on some of the machines exceeding two inches/second. These failures were costing 8 to 10 hours a week in down time and $183,000 a year in maintenance expense. The action team assembled to work on these issues had representatives from operations, maintenance and engineering.
The team conducted a root cause failure analysis and determined that the real villains were a lack of proper cleaning and a number of issues directly related to the condition of the equipment, such as poor shaft to rotor alignment, out of tolerance bearing fit, poor condition of o-ring seating surfaces and unmatched belt sets. To really eliminate these defects (in operator technique and equipment failure), every person on the team needed to contribute from their area of expertise as well as calling in experts from outside the company.
The countermeasures that the team recommended and instituted were:
Get the right people in the room and look out! The centrifuge team proves once again that Lilly people can pull together and really accomplish great things. Together Everyone Accomplishes More is their slogan and proactive maintenance's goal is to accomplish more with the people and equipment they have on site.
More Success Stories |
![]() Home |